Mar 18 11:50-12:30 Divide and conquer! Matched up bottom tier to top tier of skirt without too much headache; turns out I calculated the difference in fullness between the two pretty well-there will be just enough gathering at the top edge of the bottom tier to make things interesting.
Mar 19 12-1 Begin gathering and tacking skirt top and bottom together. Not sure if it made it easier or more difficult, but because of the way I pinned the tiers together, was able to run gathering threads and make a tack stitch about every 3 inches at the same time. Made it about 1/3 the way around
Mar 21 12:30-1:30 Another 1/3 the way around
Mar 22 11:30-12:30 Finished the last 1/3. Will take the dress home this weekend to try with my corset and attempt some in-progress photography. Also need to order brown silk thread for the buttonholes. Had thought to use cotton floss, but decided that it may abrade too easily.
Friday, March 22, 2013
Friday, March 15, 2013
Ministrations, 3rd Continuation
Mar 7 11:30-12:30 Finish neck edge, attach armscye piping and waistband, begin attaching waistband piping.
Mar 12 sometime around lunch: complete waistband piping, finish sleeve cuffs
Mar 14 12:10-12:50: pin in sleeves, attach one. Need to take the skirt home and re-iron so the hem and hem facing so they will be somewhat even.
7:30-9 pm Okay, cheated a bit. Took the skirt home to iron hem and hem facing. Went ahead and attached the top of the hem facing before I repacked the dress into my work bag. I think I will go ahead and add a wrapped hem braid since this will be a workhorse of a dress.
Mar 15 11:30-12 set second sleeve
Mar 12 sometime around lunch: complete waistband piping, finish sleeve cuffs
Mar 14 12:10-12:50: pin in sleeves, attach one. Need to take the skirt home and re-iron so the hem and hem facing so they will be somewhat even.
7:30-9 pm Okay, cheated a bit. Took the skirt home to iron hem and hem facing. Went ahead and attached the top of the hem facing before I repacked the dress into my work bag. I think I will go ahead and add a wrapped hem braid since this will be a workhorse of a dress.
Mar 15 11:30-12 set second sleeve
Tuesday, March 5, 2013
Ministrations, 2nd Continuation
January 30: 11:45-12:30 Finished gathering threads in bodice fronts and back, tacked back lining and fabric together and drew up gathers.
January 31: 11:30-12 pinned in front plackets, basted neckline, started right placket
February 4: 12:05-12:40 Finished right placket, stitched both darts right side
Sometime between 2/5-8: pulled up gathers of left side, basted in place; finished right placket and one dart
February 11: 12:25-12:45 finished second dart and pulled up gathers; Began basting fabric to lining.
February 28: 12-12:30 Bodice attach right front to back, pin left front in place.
March 4: 11:30-12:30 Finish attaching fronts to backs, test fit (without corset, see note): the fit is a shade too tight for wear with buttons and functioning button holes once I put my corset on. Let sides out about 3/8 inch each side to take strain off fasteners. Begin neck-piping
Note: My corset actually increases the size of my ribcage by about ½ inch before decreasing my waist size about 1.5 inches.
Mar 5: 11:30-12:00 Finish armscye and waist piping, attach neck piping
January 31: 11:30-12 pinned in front plackets, basted neckline, started right placket
February 4: 12:05-12:40 Finished right placket, stitched both darts right side
Sometime between 2/5-8: pulled up gathers of left side, basted in place; finished right placket and one dart
February 11: 12:25-12:45 finished second dart and pulled up gathers; Began basting fabric to lining.
February 28: 12-12:30 Bodice attach right front to back, pin left front in place.
March 4: 11:30-12:30 Finish attaching fronts to backs, test fit (without corset, see note): the fit is a shade too tight for wear with buttons and functioning button holes once I put my corset on. Let sides out about 3/8 inch each side to take strain off fasteners. Begin neck-piping
Note: My corset actually increases the size of my ribcage by about ½ inch before decreasing my waist size about 1.5 inches.
Mar 5: 11:30-12:00 Finish armscye and waist piping, attach neck piping
Subscribe to:
Posts (Atom)