Mar 7 11:30-12:30 Finish neck edge, attach armscye piping and waistband, begin attaching waistband piping.
Mar 12 sometime around lunch: complete waistband piping, finish sleeve cuffs
Mar 14 12:10-12:50: pin in sleeves, attach one. Need to take the skirt home and re-iron so the hem and hem facing so they will be somewhat even.
7:30-9 pm Okay, cheated a bit. Took the skirt home to iron hem and hem facing. Went ahead and attached the top of the hem facing before I repacked the dress into my work bag. I think I will go ahead and add a wrapped hem braid since this will be a workhorse of a dress.
Mar 15 11:30-12 set second sleeve
No comments:
Post a Comment